Topic: sd4 coverted to direct drive and gt2
So I started my conversion to direct drive, and rebuilt the gantry.
Whipped up three new parts to make it all work. The first part was a direct drive mount for the y-drive
Then I designed some new y-axis carriages. The lawsy ones didn't hold the bearings tight, so I tweaked them.

I removed the 6mm drive rod, and replaced it with a 8mm rod with flanged bearings at both ends. I also eliminated the front pulley blocks, and replaced them with a 8mm rod with flanged bearings at both ends. Here's a pic of where I'm at. Just need to trim the rods and get the extruder mounted again. Also, all pulleys and belts will be gt2.

